VES provided MEP/FP engineering services to renovate the three buildings that makeup Gary Elementary School. Included in the project were an entirely new fire alarm, life safety, and generator system. The new generator provided life safety emergency power to each of the three buildings on the campus. Also included were a new roof, exhaust fans, restroom renovations, roof drainage repair and replacement, an elevator addition, and miscellaneous PTAC and unit ventilator replacement.

VES was the Engineer of Record as a sub-consultant to Solomon Cordwell Buenz (SCB) Architects, who served as the Architect of Record (AOR). 

Project Facts

 

Location:  Chicago, IL

Completion:  September 2018

Size: 140,000 SF

Market:  Education

Services:  Engineer of Record

              MEP/FP Engineering